Menu

Deliveries of graphic concrete elements for Hilton Hotel to begin this week

19/12/2023

E-Betoonelement and Merko Ehitus Eesti have cooperated to build a new Hilton hotel at Tartu mnt in Tallinn. E-Betoonelement delivers wall elements with beautiful graphic concrete finish and other load-bearing structural elements to the building, as well as prepares the designs of all elements in the BIM system.

Project: Hotell Hampton by Hilton
Location: Tartu mnt. 49, Tallinn
Client: Merko Ehitus Eesti AS
Architect: Tõnis Tarbe, Arhitekt Tarbe OÜ
Contract: element designs, element manufacture and transport
Product nomenclature: hollow core slabs, single-, double and triple-layer wall elements, posts, beams, stair marches and landings, socle elements
Sales Manager at E-Betoonelement: Erik Albert
Sales Engineer at E-Betoonelement: Neeme Kasela
Project Manager at E-Betoonelement: Toomas Böttcher
Delivery: December 2023 - May 2024

Photos: Arhitekt Tarbe OÜ

Sales Manager at E-Betoonelement Erik Albert: "We are happy to announce that, in cooperation with Merko Ehitus, we are building a new Hilton hotel, which stands out with its exterior finish chosen by architect Tõnis Tarbe. The graphic surface finishing, with rather modest demand in Estonia, makes the completed building special and noticeable, as well as aesthetically fitting for the urban space.

E-Betoonelement will start deliveries this week and continue them until May 2024. We supply hollow core slabs, single- and double-layer wall elements, insulated three-layer SW walls with graphic finish, posts, beams, stair marches and landings, as well as single-layer and insulated socle elements to the Hilton Hotel.

In addition to the manufacture of elements, E-Betoonelement's contract also includes the designing of elements in the BIM model, which allows us to carefully plan for resources and avoid duplication. This also means less paperwork and that the progress of the project and deliveries can be monitored in real time."

The new Hilton hotel will have 185 rooms, the building will be built mainly as a five-story building and partly as a six-story building. The hotel will open at the end of 2024.

Read more:
https://group.merko.ee/project/hampton-by-hilton-hotell/
https://majandus.postimees.ee/7781256/tallinnasse-tuleb-veel-uks-hiltoni-hotell
https://kodu.postimees.ee/7412502/uus-hiltoni-hotell-ikka-tuleb

More news

Kõik õigused kaitstud © 2024 E-Betoonelement OÜ Powered by TENFOR marketing
magnifiercrossmenuchevron-down