{"id":7875,"date":"2016-06-03T16:35:43","date_gmt":"2016-06-03T16:35:43","guid":{"rendered":"https:\/\/betoonelement.ee\/shortage-of-concrete-delays-the-constructions\/"},"modified":"2022-02-07T15:19:36","modified_gmt":"2022-02-07T13:19:36","slug":"uudised-2016-betooninappus-paneb-ehitused-venima","status":"publish","type":"post","link":"https:\/\/betoonelement.ee\/en\/uudised-2016-betooninappus-paneb-ehitused-venima\/","title":{"rendered":"Shortage of concrete delays the constructions"},"content":{"rendered":"<p><a href=\"http:\/\/arileht.ee\" target=\"_blank\" rel=\"noreferrer noopener\">\u00e4rileht.ee<\/a><br>Kadri Paas, Romet Kreek&nbsp;<\/p>\n\n\n\n<p>The construction companies claim that the capacities of precast concrete manufacturers are so low that the completion of construction objects will be delayed.&nbsp;<\/p>\n\n\n\n<p>The head manager of RAMM Ehitus Mr Priit Raud says that one of their biggest unfinished buildings is Arco Vara Kodulahe real estate development close to Stroomi beach. It is a large building with 125 apartments. Therefore, ordering all the necessary details for this meant a lot of hassle. \u201cThe truth is that we had to order some of the details, stairs, from a Latvian manufacturer. The remaining elements will be supplied by E-Betoonelement, however, again within seven months. This means that the assembly has to wait for the supply of elements. We could install quicker, but we haven\u2019t got anything to install,\u201d says Raud.<\/p>\n\n\n\n<p>RAMM has another large apartment building under construction in Mardi street in Tallinn. This site was in a better position in terms of concrete elements as the construction commenced already during last year when we had no problems with receiving the \u201cpieces\u201d from E-Betoonelement. \"This problem has occurred over the last six months that the Estonian precast concrete manufacturers cannot anymore supply their products in a few months\u2019 time,\" says Raud with concern.<\/p>\n\n\n\n<p>The head manager of E-Betoonelement Mr Vaido Leosk is commenting the article in \u00c4rileht where construction companies blame the concrete manufacturers in slow and prolonged delivery time that the builders have been clearly too hard on the precast concrete manufacturers.<\/p>\n\n\n\n<p>\"Kogu kaup ei l\u00e4he ekspordiks. Betoonelementide turul on eksport olnud v\u00e4ga oluline 2008. aasta kriisist alates. Eesti turu n\u00f5udlus ei ole olnud piisav ja seet\u00f5ttu on betoonelementide tootjad pidevalt otsinud ekspordikanaleid. Eesti elemenditootjate k\u00f5rge kvaliteeditase ja pikaajaline t\u00f6\u00f6 kannab vilja ja eksportivaid ettev\u00f5tteid on aina lisandunud,\" r\u00e4\u00e4gib Leosk.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"401\" src=\"https:\/\/betoonelement.ee\/wp-content\/uploads\/2016\/06\/Mardi-tn-46_0.jpg\" alt=\"\" class=\"wp-image-10500\"\/><\/figure>\n\n\n\n<p><em>Mardi street 4, 6 apartment buildings, completed in 2013. Photo: E-Betoonelement<\/em><\/p>\n\n\n\n<p>\"Suure rahvusvahelise kontserni osana v\u00f5in aga kinnitada, et praegused tarneajad Eestis on samasugused kui enamikus ekspordi sihtriikides. Lihtsalt Eesti ehitajad on elanud enda jaoks v\u00e4ga mugavas olukorras, kus betoonelemendi tarneid ei pidanud suure \u00fclepakkumise t\u00f5ttu pikalt ette planeerima. Muutunud olukord sunnib tegelema pikemaajalise planeerimisega,\" m\u00e4rgib E-Betoonelemendi juht.<\/p>\n\n\n\n<p>N\u00f5udlus kohalikul turul on kasvanud eelk\u00f5ige elamute ja Tallinna Vangla lisanduvate mahtude t\u00f5ttu. \"Betoonelementidest lahendus on ajas kestev ja v\u00e4hest j\u00e4relhooldust vajav ja tagab stabiilse sisekliima. Seet\u00f5ttu on betoonelementidest elamute ehitus eelistatuim ehituslahendus elamute turul,\" usub Leosk.<\/p>\n\n\n\n<p>N\u00f5udlus p\u00f5hilistel eksporditurgudel Rootsis-Soomes on k\u00f5rge ja nii ongi keskmised tarnet\u00e4htajad pikemaks veninud. \"Soovitus on ehitajatel j\u00e4rgmise aasta projektide puhul teha pikemaajalist ette planeerimist ja kaasata elementide tarnijate teadmised projekteerimise etapis. N\u00f5nda ei tule ka \u00fcllatusena elementide vajadus tootjale ja ehitajal tekib varasem kindlus elementide tarnet\u00e4htaegade osas,\" annab ettev\u00f5tte juht n\u00f5u.<\/p>\n\n\n\n<p>Ekspordi osa moodustab E-Betoonelemendi kogutoodangust umbes kolmandiku. \"Meie p\u00f5hiturg on siiski Eesti ja Eesti klient,\" lisab Leosk.<\/p>\n\n\n\n<p>More on this topic:<br>03.06.2016&nbsp;<a href=\"http:\/\/arileht.delfi.ee\/news\/uudised\/kes-keda-koorib-ehitajad-suudistavad-betoonitootjaid-hoonete-venimises?id=74712955\" target=\"_blank\" rel=\"noreferrer noopener\">Shortage of concrete delays the constructions<\/a><br>03.06.2016&nbsp;<a href=\"http:\/\/arileht.delfi.ee\/news\/uudised\/betoonelement-torjub-kriitikat-ehitajad-on-elanud-pikalt-mugavas-olukorras-planeerige-oma-tood-ette?id=74715881\" target=\"_blank\" rel=\"noreferrer noopener\">Construction work must be planned more than before<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>\u00c4rileht.ee Kadri Paas, Romet Kreek The construction companies claim that the capacities of precast concrete manufacturers are so low that the completion of construction objects will be delayed. The head manager of RAMM Ehitus Mr Priit Raud says that one of their biggest unfinished buildings is Arco Vara Kodulahe real estate development close to Stroomi...<\/p>","protected":false},"author":3,"featured_media":10728,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[69],"tags":[],"class_list":["post-7875","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2016-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/posts\/7875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/comments?post=7875"}],"version-history":[{"count":3,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/posts\/7875\/revisions"}],"predecessor-version":[{"id":16571,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/posts\/7875\/revisions\/16571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/media\/10728"}],"wp:attachment":[{"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/media?parent=7875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/categories?post=7875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/betoonelement.ee\/en\/wp-json\/wp\/v2\/tags?post=7875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}